What the letters mean, which CEB solar scheme is open for your home or your business today, and the words you will meet in the paperwork.
Chat on WhatsAppIn plain words
Both mean the same thing: making electricity close to where it is used, usually with solar panels on a roof, and connecting it to the CEB network instead of a big power station far away. Only the size changes.
Small-Scale Distributed Generation
The CEB's SSDG Grid Code (April 2026) defines it as generation up to 50 kW connected to its low-voltage network.
For example: a house. The 2026 household scheme accepts up to 10 kWac of export, far below this limit, so every home system is SSDG-sized.
Read the SSDG Grid CodeMedium-Scale Distributed Generation
Bigger than SSDG. The CEB's MSDG Phase 2 scheme looks at non-domestic projects up to 2 MW; anything above is not considered under it.
For example: a shop, a factory, a hotel or a farm roof.
Read the MSDG leafletCarbon Neutral Commercial Sector
Not a size class but a separate 2026 scheme the CEB offers as a pilot to its major commercial consumers, on tariff codes 225 and 225A.
For example: a large commercial site that already pays the 225 tariff.
See the scheme on ceb.muIn one sentence: SSDG is the small size, MSDG the medium size, and the CEB runs different schemes, with different rules, for homes and for businesses.
Which one is for me?
The scheme depends on your type of CEB account, not on the letters. These three are open today.
I own a home
I run a shop, factory, hotel or farm
I am a large commercial consumer
The CEB's list changes from time to time and says its schemes are being updated. Before you apply, check the scheme on ceb.mu or ask us: we prepare CEB files with customers every week.
Words decoded
Eight terms, each in a sentence or two.
What is open, what is history
People still search for the old names. Here is what each one is today.
2026
Merges the 2015 SSDG net-metering scheme and the 2021 domestic scheme. A grant of 25 % up to Rs 75,000, then gross metering at Rs 4.83 per kWh or net metering, which is still proposed.
For: homes, CEB domestic customers
See the scheme on ceb.mu2026
Solar projects for major commercial consumers, offered as a pilot. The Government approved it at Cabinet on 23 January 2026.
For: commercial customers on tariffs 225 and 225A
See the scheme on ceb.mu2023
Gross metering for non-domestic customers: 10 MW in total, projects up to 2 MW, SSDG-size projects accepted too. Launched on 28 March 2023; projects beyond the capacity go on a waiting list, so ask the CEB what is left.
For: businesses and other non-domestic customers
See the scheme on ceb.mu2021
The 2021 home scheme. Since the 2026 household scheme merges it with the 2015 net-metering scheme, homes now apply under the 2026 scheme.
For: homes
See the scheme on ceb.mu2015
The 2015 SSDG net-metering scheme (Phase 3), the 2016 MSDG net-metering scheme and the PECR scheme were closed on 31 December 2021.
For: homes and businesses
Read the closing notice2019
The 2019 scheme that gave domestic customers a free PV kit is shown as closed on the CEB list.
For: homes
See the CEB scheme listStatuses follow the CEB's own list of PV schemes, which says the schemes are being updated. If a name matters to you, check it on ceb.mu before you apply.
Questions
Answers taken from the CEB documents listed beside them.
Last checked 13 October 2026
SSDG is Small-Scale Distributed Generation and MSDG is Medium-Scale Distributed Generation. Both mean producing electricity close to where it is used, typically with solar panels on a roof, and connecting it to the CEB network. The CEB's SSDG Grid Code (April 2026) defines SSDG as up to 50 kW, and its MSDG Phase 2 scheme covers larger projects, up to 2 MW.
Source: CEB — SSDG Grid Code (April 2026) · CEB — MSDG Scheme Phase 2 information leaflet
A home is SSDG-sized: the 2026 household scheme accepts up to 10 kWac of export, far below the 50 kW SSDG limit. The MSDG Phase 2 scheme is for non-domestic customers such as businesses.
Source: CEB information leaflet (revised July 2026) · CEB — MSDG Scheme Phase 2 information leaflet
The 2015 SSDG net-metering scheme and the 2016 MSDG net-metering scheme closed on 31 December 2021, and the 2019 net-billing scheme with a free kit is closed too. Today a home applies under the Household Rooftop Solar PV Scheme 2026. A business can apply under MSDG Phase 2 or, if it is a major commercial consumer on tariff 225 or 225A, under the CNCS 2026 scheme. The CEB updates its list from time to time, so check before you apply.
Source: CEB — closing of former renewable energy schemes · CEB — all PV schemes · CEB — Household scheme 2026 · CEB — CNCS RE Scheme 2026
With gross metering, everything your system produces is counted as sent to the grid and credited at a fixed rate. With net metering, your system first covers your own use and only the surplus is credited. MSDG Phase 2 uses gross metering; the household scheme offers gross metering and a proposed net-metering option.
Source: CEB — MSDG Scheme Phase 2 information leaflet · CEB information leaflet (revised July 2026)
For a home, the household scheme requires a battery above 3.5 kWac, sized for at least 3 hours of evening demand. For MSDG Phase 2, the CEB leaflet says the grid supports the system, so no energy storage is required.
Source: CEB information leaflet (revised July 2026) · CEB — MSDG Scheme Phase 2 information leaflet
The CEB's 2023 leaflet gives Rs 4.20 per kWh and says the rate is revised every year. The household rate is Rs 4.83 since July 2026. Ask the CEB for the current MSDG rate before you rely on a figure.
Source: CEB — MSDG Scheme Phase 2 information leaflet · CEB information leaflet (revised July 2026)
After a network study, the Connection Agreement must be signed before you order any equipment, and the CEB leaflet requires the installation to be finished within one year of signing it. It must also comply with the Grid Code.
Ready when you are
Tell us about your roof and your CEB account. We tell you which scheme applies, what the CEB asks for and how we prepare the file with you.
Chat on WhatsApp